Country snapshot · North Africa

Algeria

Export rules: None foundData as of 10 October 2026
1,399.3MW
Solar added in 2026 (Ember estimate, all segments)1N3,N4
1,399.3 MW (1.4 GW)
+41%
Change on 20251
2025: 993.4 MW (Ember estimate)
100.0%
Access to electricity, 20242N5
0.00million
People without electricity, 2024 (DERCA calculation)2N5

Solar added each year

Ember estimates of all solar (utility-scale, distributed and off-grid), MW. 2026 is Ember’s full-year estimate.

Algeria: solar added per year, 2023–2026, MW (Ember estimates)2023: 76.3 MW; 2024: 98.3 MW; 2025: 993.4 MW; 2026 estimate: 1,399.3 MW76.3202398.32024993.420251,399.32026E
Algeria: solar added per year, 2023–2026, MW (Ember estimates)2023: 76.3 MW; 2024: 98.3 MW; 2025: 993.4 MW; 2026 estimate: 1,399.3 MW76.3202398.32024993.420251,399.32026E
View as tableHide table
Solar added per year, MW
YearMWBasis
202376.3Ember estimate
202498.3Ember estimate
2025993.4Ember estimate
2026E1,399.3Ember estimate, full year

8.0% of Africa’s estimated 2026 solar additions (1,399.3 of 17,449.4 MW).1

Who has electricity

Share of people with access to electricity, 2024: rural and urban.

Algeria: access to electricity, rural vs urban, 2024Rural 100.0%, urban 100.0%, national 100.0%.National 100.0%Rural 100.0%Urban 100.0%0%25%50%75%100%
Algeria: access to electricity, rural vs urban, 2024Rural 100.0%, urban 100.0%, national 100.0%.National 100.0%Rural 100.0%Urban 100.0%0%50%100%
View as tableHide table
Access to electricity, 2024
AreaAccessYear
Rural100.0%2024
Urban100.0%2024
National100.0%2024
Rural 100.0%Urban 100.0%Without electricity 0.00m (DERCA calculation)

World Bank WDI, 2024.2

How reliable is the grid for business?

Firms experiencing electrical outages, compared with Sub-Saharan Africa and the world.3,4N1,N6

No survey dataN1,N6 · Sub-Saharan Africa 72.4% · World 47.5% (2025)

The rules for small-scale generationN2,N7

Export rules: None found

Regulator
CREG
Main utility
Sonelgaz (supply monopoly)
Export rulesNone found. Small PV is limited to self-consumption; surplus may not be fed into the grid. A schools pilot studies LV injection.5,6Medium confidenceShow detail

None found. Small PV is limited to self-consumption, and surplus may not be fed into the grid

A green municipalities pilot (schools, since 2019) plans LV injection on a study basis. The legal framework for auto-consumers is still being studied

Sources: 5, 6
How exports are creditedNone foundShow detail

None found

Size limits and licensingNone found for self-consumption.6Medium confidenceShow detail

None found for self-consumption. The auction tier covers 10–20 GWh/yr per site, and tenders cover >20 GWh/yr

Sources: 6
Mini-grid rulesNone foundShow detail

None found

Market access beyond the utilityLaw allows direct bilateral contracts between eligible customers and suppliers (Laws 02-01, 2002; 04-09, 2004).6Medium confidenceShow detail

Law allows a direct bilateral contract between an eligible customer and a supplier, with CREG to publish templates (corporate PPA). Laws cited: 02-01 (2002), 04-09 (2004)

Sources: 6
Aggregation / VPP rulesNone foundShow detail

None found

“None found” means we could not locate a rule in public sources reviewed to 10 October 2026, not that one cannot exist.

Recent developments

Dated developments, 2024–2026.

  1. Jun 2025

    Solar panel imports rose 33-fold in the 12 months to June 2025 (Ember).8

  2. Mar 2024

    EPC winners announced for 3 GW of Sonelgaz solar tenders; target of 15 GW renewables by 2035.7

The full report

This is a snapshot. The full story is in Africa’s Invisible Grid.

The full analysis, with 17 exhibits on the boom, the data gap, the economics and the four building blocks, is in Africa’s Invisible Grid.

Get the full report

Africa’s Invisible Grid (PDF, 30 pages). Enter your details and we’ll email you a link to the report.