Country snapshot · West Africa
Benin
Solar added each year
Ember estimates of all solar (utility-scale, distributed and off-grid), MW. 2026 is Ember’s full-year estimate.
View as tableHide table
| Year | MW | Basis |
|---|---|---|
| 2023 | 69.8 | Ember estimate |
| 2024 | 23.5 | Ember estimate |
| 2025 | 97.1 | Ember estimate |
| 2026E | 50.0 | Ember estimate, full year |
0.3% of Africa’s estimated 2026 solar additions (50.0 of 17,449.4 MW).1
Who has electricity
Share of people with access to electricity, 2024: rural and urban.
View as tableHide table
| Area | Access | Year |
|---|---|---|
| Rural | 45.0% | 2024 |
| Urban | 71.6% | 2024 |
| National | 59.0% | 2024 |
World Bank WDI, 2024.2
How reliable is the grid for business?
Firms experiencing electrical outages (2024 survey), compared with Sub-Saharan Africa and the world.3,4N4
86.1% (2024 survey) · Sub-Saharan Africa 72.4% · World 47.5% (2025)
The rules for small-scale generationN5
Export rules: Partial
- Regulator
- ARE (Benin)
- Main utility
- SBEE
Export rulesElectricity Code 2020 allows self-producer surplus injection up to 50% of authorised capacity; the implementing order was not found.5,6High confidenceShow detail
**Code de l'électricité, Loi 2020-05 (1 Apr 2020).** The law defines the autoproducteur as someone who may sell surplus to a distribution network operator. Art. 27 allows surplus injection up to **50% of authorised capacity**, set in the purchase contract, with injection rules to come by ministerial arrêté prioritising RE. That arrêté was **not found**.
How exports are creditedNone found; the Code sets no price.5,6Medium confidenceShow detail
None found. The Code sets no price; the regulator has drafted model contracts; AEP recommends standard RE purchase contracts.
Size limits and licensingThresholds set by decree (not found). Off-grid: authorisation up to 500 kVA.5,6High confidenceShow detail
Art. 33: declaration to ARE below a threshold set by decree. Art. 34: authorisation above that threshold, excluding purely domestic use. **No kW figure is in the law**, and the decree was not found. Off-grid: authorisation up to 500 kVA; concession above.
Mini-grid rules2020 Code defines pico- and mini-grids and the off-grid regime.5,6Medium confidenceShow detail
The 2020 Code defines pico- and mini-grids and the off-grid authorisation and concession regime (500 kVA split). AEP says a mini-grid connection code has been developed and grid-arrival rules clarified (no year).
Market access beyond the utilityRight of access to public networks, with priority for renewables.5,6High confidenceShow detail
Art. 29 guarantees a right of access to public transmission and distribution networks, with priority for RE. An operator may refuse only on security, safety or quality grounds, notified to ARE. "Eligible customer" third-party supply is defined in Art. 5.
Aggregation / VPP rulesNone foundShow detail
None found
“None found” means we could not locate a rule in public sources reviewed to 10 October 2026, not that one cannot exist.
Recent developments
Dated developments, 2024–2026.