Export rules: PartialData as of 10 October 2026
12.2MW
Solar added in 2026 (Ember estimate, all segments)1N3,N4
– (not shown: the 2025 base is under 10 MW)
Change on 20251N1
2025: 2.7 MW (Ember estimate)
20.1%
Access to electricity, 20242N5
11.22million
People without electricity, 2024 (DERCA calculation)2N5

Solar added each year

Ember estimates of all solar (utility-scale, distributed and off-grid), MW. 2026 is Ember’s full-year estimate.

Burundi: solar added per year, 2023–2026, MW (Ember estimates)2023: 1.6 MW; 2024: 0.6 MW; 2025: 2.7 MW; 2026 estimate: 12.2 MW1.620230.620242.7202512.22026E
Burundi: solar added per year, 2023–2026, MW (Ember estimates)2023: 1.6 MW; 2024: 0.6 MW; 2025: 2.7 MW; 2026 estimate: 12.2 MW1.620230.620242.7202512.22026E
View as tableHide table
Solar added per year, MW
YearMWBasis
20231.6Ember estimate
20240.6Ember estimate
20252.7Ember estimate
2026E12.2Ember estimate, full year

0.1% of Africa’s estimated 2026 solar additions (12.2 of 17,449.4 MW).1

Who has electricity

Share of people with access to electricity, 2024: rural and urban.

Burundi: access to electricity, rural vs urban, 2024Rural 3.6%, urban 70.0%, national 20.1%.National 20.1%Rural 3.6%Urban 70.0%0%25%50%75%100%
Burundi: access to electricity, rural vs urban, 2024Rural 3.6%, urban 70.0%, national 20.1%.National 20.1%Rural 3.6%Urban 70.0%0%50%100%
View as tableHide table
Access to electricity, 2024
AreaAccessYear
Rural3.6%2024
Urban70.0%2024
National20.1%2024
Rural 3.6%Urban 70.0%Without electricity 11.22m (DERCA calculation)

World Bank WDI, 2024.2

How reliable is the grid for business?

Firms experiencing electrical outages (2025 survey), compared with Sub-Saharan Africa and the world.3,4N6

Burundi: share of firms experiencing electrical outagesBurundi 93.9% (2025 survey); Sub-Saharan Africa 72.4%; World 47.5% (2025).Burundi (2025)93.9%Sub-Saharan Africa72.4%World47.5%
Burundi: share of firms experiencing electrical outagesBurundi 93.9% (2025 survey); Sub-Saharan Africa 72.4%; World 47.5% (2025).Burundi (2025)93.9%Sub-SaharanAfrica72.4%World47.5%

93.9% (2025 survey) · Sub-Saharan Africa 72.4% · World 47.5% (2025)

The rules for small-scale generationN2,N7

Export rules: Partial

Regulator
AREEN
Main utility
REGIDESO; Weza Power (private distributor, interim agreement)
Export rulesNo national rule in force. Mission 300 compact commits to net billing (by Dec 2026) and a self-generation declaration ordinance (by Jun 2026).5,6High confidenceShow detail

No national net-metering rule in force. The compact commits to "net billing" within a revised tariff structure (due Dec 2026) and a self-generation declaration-regime ordinance (due Jun 2026). Delivery status as of Oct 2026 is unknown.

Sources: 5, 6
How exports are creditedNone found. A 2016 decree allows surplus purchase contracts for operators in isolated zones.7Medium confidenceShow detail

None found. The 2016 decree allows independent operators in isolated zones to sign a surplus purchase contract.

Sources: 7
Size limits and licensingNone in force. Compact plans a simplified process for projects up to 1 MW.7Medium confidenceShow detail

None in force found. The compact plans a simplified process for projects ≤1 MW (due Dec 2025).

Sources: 7
Mini-grid rulesNone in force. Compact plans a mini-grid decree, tariff methodology and licence model.7Medium confidenceShow detail

No dedicated regulation found in force. The compact plans a rural electrification/mini-grid decree (Dec 2025) and a tariff methodology and licence model (Jun 2026). AEP reports mini-grid quality standards exist.

Sources: 7
Market access beyond the utility2024 amendment to the 2015 electricity law permits private participation in distribution.7High confidenceShow detail

Loi n°1/13 of 23 Apr 2015, amended by Loi n°1/05 of 22 Mar 2024. The revised law permits private participation in distribution. Transmission is not open to private parties except by derogation.

Sources: 7
Aggregation / VPP rulesNone foundShow detail

None found

“None found” means we could not locate a rule in public sources reviewed to 10 October 2026, not that one cannot exist.

Recent developments

Dated developments, 2024–2026.

  1. 2025

    Mission 300 compact targets 70% access by 2030.7

  2. Mar 2024

    Electricity law amended to permit private distribution.7

The full report

This is a snapshot. The full story is in Africa’s Invisible Grid.

The full analysis, with 17 exhibits on the boom, the data gap, the economics and the four building blocks, is in Africa’s Invisible Grid.

Get the full report

Africa’s Invisible Grid (PDF, 30 pages). Enter your details and we’ll email you a link to the report.