Country snapshot · East Africa
Comoros
Solar added each year
Ember estimates of all solar (utility-scale, distributed and off-grid), MW. 2026 is Ember’s full-year estimate.
View as tableHide table
| Year | MW | Basis |
|---|---|---|
| 2023 | 0.0 | Ember estimate |
| 2024 | 8.2 | Ember estimate |
| 2025 | 2.9 | Ember estimate |
| 2026E | 14.9 | Ember estimate, full year |
0.1% of Africa’s estimated 2026 solar additions (14.9 of 17,449.4 MW).1
Who has electricity
Share of people with access to electricity, 2024: rural and urban.
View as tableHide table
| Area | Access | Year |
|---|---|---|
| Rural | 88.2% | 2024 |
| Urban | 98.5% | 2024 |
| National | 91.7% | 2024 |
World Bank WDI, 2024.2
How reliable is the grid for business?
Firms experiencing electrical outages (2025 survey), compared with Sub-Saharan Africa and the world.3,4N6
91.7% (2025 survey) · Sub-Saharan Africa 72.4% · World 47.5% (2025)
The rules for small-scale generationN2,N7
Export rules: None found
- Regulator
- AREE (created; not yet operational)
- Main utility
- SONELEC
Export rulesNone found. A draft decree on renewable self-production and mini-grids was targeted for Dec 2025.5,6Medium confidenceShow detail
None found. A draft decree on renewable self-production and mini-grids was targeted for Dec 2025.
How exports are creditedNone foundShow detail
None found
Size limits and licensingNone found5,6Low confidenceShow detail
None found. The compact mentions a willing-buyer/willing-seller regime below an unspecified capacity threshold for small mini-grids.
Mini-grid rulesElectricity Code 2023 promotes mini-grids; implementing texts not adopted.5,6High confidenceShow detail
Code de l'énergie électrique (loi n°78/PR/2023), Art. 50 promotes mini-grids, but implementing texts were not adopted. A simplified procedure was planned by Mar 2026.
Market access beyond the utilityGrid Code adopted 2022; IPP concession framework and payment guarantees planned.5,6Medium confidenceShow detail
Grid Code adopted 2022. Concession framework for RE projects and SONELEC payment guarantees for IPPs are planned.
Aggregation / VPP rulesNone foundShow detail
None found
“None found” means we could not locate a rule in public sources reviewed to 10 October 2026, not that one cannot exist.
Recent developments
Dated developments, 2024–2026.
The full report
This is a snapshot. The full story is in Africa’s Invisible Grid.
The full analysis, with 17 exhibits on the boom, the data gap, the economics and the four building blocks, is in Africa’s Invisible Grid.