Country snapshot · Central Africa
Equatorial Guinea
Solar added each year
Ember estimates of all solar (utility-scale, distributed and off-grid), MW. 2026 is Ember’s full-year estimate.
View as tableHide table
| Year | MW | Basis |
|---|---|---|
| 2023 | 2.1 | Ember estimate |
| 2024 | 0.8 | Ember estimate |
| 2025 | 2.3 | Ember estimate |
| 2026E | 7.1 | Ember estimate, full year |
0.0% of Africa’s estimated 2026 solar additions (7.1 of 17,449.4 MW).1
Who has electricity
Share of people with access to electricity, 2024: rural and urban.
View as tableHide table
| Area | Access | Year |
|---|---|---|
| Rural | 5.1% | 2024 |
| Urban | 89.3% | 2024 |
| National | 65.1% | 2024 |
World Bank WDI, 2024.2
How reliable is the grid for business?
Firms experiencing electrical outages (2024 survey), compared with Sub-Saharan Africa and the world.3,4N6
33.3% (2024 survey) · Sub-Saharan Africa 72.4% · World 47.5% (2025)
The rules for small-scale generationN2,N7
Export rules: None found
- Regulator
- No independent regulator identified (ministry)
- Main utility
- SEGESA
Export rulesNone in force. A 2018 plan proposed net-balance self-consumption as a future action.5Medium confidenceShow detail
None found in force. PANDER (2018) proposed net-balance self-consumption with bidirectional metering as a planned action only
How exports are creditedNone foundShow detail
None found
Size limits and licensingNone foundShow detail
None found
Mini-grid rulesNone found5Medium confidenceShow detail
None found (only hybrid-generation quotas proposed for isolated systems)
Market access beyond the utilityGeneral Electricity Law was 'in process of approval' in 2018; current status unverified.6Low confidenceShow detail
General Electricity Law was "in process of approval" in 2018 (current status not verified); 2002 tariff law sets rural prices for independent producers
Aggregation / VPP rulesNone foundShow detail
None found
“None found” means we could not locate a rule in public sources reviewed to 10 October 2026, not that one cannot exist.
Recent developments
Dated developments, 2024–2026.
- Sep 2025
Government ordered an audit of SEGESA as part of restructuring.7
The full report
This is a snapshot. The full story is in Africa’s Invisible Grid.
The full analysis, with 17 exhibits on the boom, the data gap, the economics and the four building blocks, is in Africa’s Invisible Grid.