Country snapshot · Southern Africa

Eswatini

Export rules: YesData as of 10 October 2026
0.9MW
Solar added in 2026 (Ember estimate, all segments)1N3,N4
– (not shown: the 2025 base is under 10 MW)
Change on 20251N1
2025: 0.7 MW (Ember estimate)
89.3%
Access to electricity, 20242N5
0.13million
People without electricity, 2024 (DERCA calculation)2N5

Solar added each year

Ember estimates of all solar (utility-scale, distributed and off-grid), MW. 2026 is Ember’s full-year estimate.

Eswatini: solar added per year, 2023–2026, MW (Ember estimates)2023: 0.5 MW; 2024: 0.2 MW; 2025: 0.7 MW; 2026 estimate: 0.9 MW0.520230.220240.720250.92026E
Eswatini: solar added per year, 2023–2026, MW (Ember estimates)2023: 0.5 MW; 2024: 0.2 MW; 2025: 0.7 MW; 2026 estimate: 0.9 MW0.520230.220240.720250.92026E
View as tableHide table
Solar added per year, MW
YearMWBasis
20230.5Ember estimate
20240.2Ember estimate
20250.7Ember estimate
2026E0.9Ember estimate, full year

0.0% of Africa’s estimated 2026 solar additions (0.9 of 17,449.4 MW).1

Who has electricity

Share of people with access to electricity, 2024: rural and urban.

Eswatini: access to electricity, rural vs urban, 2024Rural 88.3%, urban 92.1%, national 89.3%.National 89.3%Rural 88.3%Urban 92.1%0%25%50%75%100%
Eswatini: access to electricity, rural vs urban, 2024Rural 88.3%, urban 92.1%, national 89.3%.National 89.3%Rural 88.3%Urban 92.1%0%50%100%
View as tableHide table
Access to electricity, 2024
AreaAccessYear
Rural88.3%2024
Urban92.1%2024
National89.3%2024
Rural 88.3%Urban 92.1%Without electricity 0.13m (DERCA calculation)

World Bank WDI, 2024.2

How reliable is the grid for business?

Firms experiencing electrical outages (2024 survey), compared with Sub-Saharan Africa and the world.3,4N6

Eswatini: share of firms experiencing electrical outagesEswatini 58.5% (2024 survey); Sub-Saharan Africa 72.4%; World 47.5% (2025).Eswatini (2024)58.5%Sub-Saharan Africa72.4%World47.5%
Eswatini: share of firms experiencing electrical outagesEswatini 58.5% (2024 survey); Sub-Saharan Africa 72.4%; World 47.5% (2025).Eswatini (2024)58.5%Sub-SaharanAfrica72.4%World47.5%

58.5% (2024 survey) · Sub-Saharan Africa 72.4% · World 47.5% (2025)

The rules for small-scale generationN2,N7

Export rules: Yes

Regulator
ESERA
Main utility
Eswatini Electricity Company (EEC)
Export rulesSmall-Scale Embedded Generation framework (net billing, 2021/22); EEC embedded-generation feed-in tariffs in force from 1 Aug 2026 to 31 Mar 2027 (EEC approved tariff schedule).5,6High confidenceShow detail

ESERA's Small-Scale Embedded Generation (SSEG) Framework of 2021/22 uses net billing, not net metering. It was in pilot as of Oct 2024. EEC "Embedded Generation Feed-in Tariffs" approved by ESERA took effect 1 Aug 2026

Sources: 5, 6
How exports are creditedFlat 51.23 c/kWh exported, excluding VAT, for non-time-of-use residential and small commercial customers; separate time-of-use rates (31.49–166.02 c/kWh by season and period). Effective 1 Aug 2026 to 31 Mar 2027. A news report adds that customers must consume more than they export each year; not stated in the schedule.5,6High confidenceShow detail

From 1 Aug 2026: 51.23c per kWh exported for residential and small commercial systems, varying by season and time of use, valid to 31 Mar 2027. Earlier pilot rate was SZL 0.79. Customers must consume more than they export each EEC financial year

Sources: 5, 6
Size limits and licensingFramework up to 1 MVA; national cap 37 MW; own use under 100 kW needs no licence.7Medium confidenceShow detail

SSEG covers up to 1 MVA. Own-use systems under 100 kW need no licence; 100 kW to under 1 MW needs a 2-year exemption. Generators selling more than 1 GWh/yr need a licence. National penetration cap is 37 MW. The 2026 ESERA portal handles embedded generation up to 2 MW. The connection fee is E8,979 for 1–350 kVA

Sources: 7
Mini-grid rulesMini- and off-grid framework completed (year not stated).7Medium confidenceShow detail

Mini- and off-grid framework "completed" (year not stated). Off-grid generation needs a licence under the Electricity Act unless the Minister grants an exemption

Sources: 7
Market access beyond the utilityWheeling framework completed Nov 2022.7Medium confidenceShow detail

ESERA Wheeling Framework completed Nov 2022. SSEG did not allow third-party sale of excess as of 2024

Sources: 7
Aggregation / VPP rulesNone found7Medium confidenceShow detail

None found. An energy-storage requirements framework was awaiting approval (2024)

Sources: 7

“None found” means we could not locate a rule in public sources reviewed to 10 October 2026, not that one cannot exist.

Recent developments

Dated developments, 2024–2026.

  1. Sep 2026

    ESERA online portal for embedded generation up to 2 MW.8

  2. Aug 2026

    Embedded-generation export tariffs took effect.8

The full report

This is a snapshot. The full story is in Africa’s Invisible Grid.

The full analysis, with 17 exhibits on the boom, the data gap, the economics and the four building blocks, is in Africa’s Invisible Grid.

Get the full report

Africa’s Invisible Grid (PDF, 30 pages). Enter your details and we’ll email you a link to the report.