2.6MW
Solar added in 2026 (Ember estimate, all segments)1N3,N4
– (not shown: the 2025 base is under 10 MW)
Change on 20251N1
2025: 0.9 MW (Ember estimate)
43.7%
Access to electricity, 20242N5
1.24million
People without electricity, 2024 (DERCA calculation)2N5

Solar added each year

Ember estimates of all solar (utility-scale, distributed and off-grid), MW. 2026 is Ember’s full-year estimate.

Guinea-Bissau: solar added per year, 2023–2026, MW (Ember estimates)2023: 0.7 MW; 2024: 1.5 MW; 2025: 0.9 MW; 2026 estimate: 2.6 MW0.720231.520240.920252.62026E
Guinea-Bissau: solar added per year, 2023–2026, MW (Ember estimates)2023: 0.7 MW; 2024: 1.5 MW; 2025: 0.9 MW; 2026 estimate: 2.6 MW0.720231.520240.920252.62026E
View as tableHide table
Solar added per year, MW
YearMWBasis
20230.7Ember estimate
20241.5Ember estimate
20250.9Ember estimate
2026E2.6Ember estimate, full year

0.0% of Africa’s estimated 2026 solar additions (2.6 of 17,449.4 MW).1

Who has electricity

Share of people with access to electricity, 2024: rural and urban.

Guinea-Bissau: access to electricity, rural vs urban, 2024Rural 24.9%, urban 65.6%, national 43.7%.National 43.7%Rural 24.9%Urban 65.6%0%25%50%75%100%
Guinea-Bissau: access to electricity, rural vs urban, 2024Rural 24.9%, urban 65.6%, national 43.7%.National 43.7%Rural 24.9%Urban 65.6%0%50%100%
View as tableHide table
Access to electricity, 2024
AreaAccessYear
Rural24.9%2024
Urban65.6%2024
National43.7%2024
Rural 24.9%Urban 65.6%Without electricity 1.24m (DERCA calculation)

World Bank WDI, 2024.2

How reliable is the grid for business?

Firms experiencing electrical outages (2025 survey), compared with Sub-Saharan Africa and the world.3,4N6

Guinea-Bissau: share of firms experiencing electrical outagesGuinea-Bissau 72.2% (2025 survey); Sub-Saharan Africa 72.4%; World 47.5% (2025).Guinea-Bissau (2025)72.2%Sub-Saharan Africa72.4%World47.5%
Guinea-Bissau: share of firms experiencing electrical outagesGuinea-Bissau 72.2% (2025 survey); Sub-Saharan Africa 72.4%; World 47.5% (2025).Guinea-Bissau(2025)72.2%Sub-SaharanAfrica72.4%World47.5%

72.2% (2025 survey) · Sub-Saharan Africa 72.4% · World 47.5% (2025)

The rules for small-scale generationN2,N7

Export rules: None found

Regulator
No autonomous regulator (2016); ministry regulates
Main utility
EAGB
Export rulesNone found (2016: no net metering, no feed-in tariff).5,6Medium confidenceShow detail

None found (2016: no net metering, no FiT)

Sources: 5, 6
How exports are creditedNone foundShow detail

None found

Size limits and licensingNone foundShow detail

None found

Mini-grid rulesNone found.7Medium confidenceShow detail

None found; EU to support analysis of mini-grid regulatory framework (2025)

Sources: 7
Market access beyond the utilityCompetitively procured solar IPPs planned with World Bank support.7Medium confidenceShow detail

Legal base Decreto-Lei 2/2007 (energy) and 3/2007 (electricity); WB-supported competitively procured solar IPPs/PPPs planned

Sources: 7
Aggregation / VPP rulesNone foundShow detail

None found

“None found” means we could not locate a rule in public sources reviewed to 10 October 2026, not that one cannot exist.

Recent developments

Dated developments, 2024–2026.

  1. May 2024

    World Bank Solar Energy Scale-up and Access Project approved.7

The full report

This is a snapshot. The full story is in Africa’s Invisible Grid.

The full analysis, with 17 exhibits on the boom, the data gap, the economics and the four building blocks, is in Africa’s Invisible Grid.

Get the full report

Africa’s Invisible Grid (PDF, 30 pages). Enter your details and we’ll email you a link to the report.