Country snapshot · Southern Africa

Lesotho

Export rules: PartialData as of 10 October 2026
37.1MW
Solar added in 2026 (Ember estimate, all segments)1N3,N4
– (not shown: the 2025 base is under 10 MW)
Change on 20251N1
2025: 0.9 MW (Ember estimate)
60.6%
Access to electricity, 20242N5
0.92million
People without electricity, 2024 (DERCA calculation)2N5

Solar added each year

Ember estimates of all solar (utility-scale, distributed and off-grid), MW. 2026 is Ember’s full-year estimate.

Lesotho: solar added per year, 2023–2026, MW (Ember estimates)2023: 1.3 MW; 2024: 0.3 MW; 2025: 0.9 MW; 2026 estimate: 37.1 MW1.320230.320240.9202537.12026E
Lesotho: solar added per year, 2023–2026, MW (Ember estimates)2023: 1.3 MW; 2024: 0.3 MW; 2025: 0.9 MW; 2026 estimate: 37.1 MW1.320230.320240.9202537.12026E
View as tableHide table
Solar added per year, MW
YearMWBasis
20231.3Ember estimate
20240.3Ember estimate
20250.9Ember estimate
2026E37.1Ember estimate, full year

0.2% of Africa’s estimated 2026 solar additions (37.1 of 17,449.4 MW).1

Who has electricity

Share of people with access to electricity, 2024: rural and urban.

Lesotho: access to electricity, rural vs urban, 2024Rural 41.4%, urban 85.2%, national 60.6%.National 60.6%Rural 41.4%Urban 85.2%0%25%50%75%100%
Lesotho: access to electricity, rural vs urban, 2024Rural 41.4%, urban 85.2%, national 60.6%.National 60.6%Rural 41.4%Urban 85.2%0%50%100%
View as tableHide table
Access to electricity, 2024
AreaAccessYear
Rural41.4%2024
Urban85.2%2024
National60.6%2024
Rural 41.4%Urban 85.2%Without electricity 0.92m (DERCA calculation)

World Bank WDI, 2024.2

How reliable is the grid for business?

Firms experiencing electrical outages (2023 survey), compared with Sub-Saharan Africa and the world.3,4N6

Lesotho: share of firms experiencing electrical outagesLesotho 64.6% (2023 survey); Sub-Saharan Africa 72.4%; World 47.5% (2025).Lesotho (2023)64.6%Sub-Saharan Africa72.4%World47.5%
Lesotho: share of firms experiencing electrical outagesLesotho 64.6% (2023 survey); Sub-Saharan Africa 72.4%; World 47.5% (2025).Lesotho (2023)64.6%Sub-SaharanAfrica72.4%World47.5%

64.6% (2023 survey) · Sub-Saharan Africa 72.4% · World 47.5% (2025)

The rules for small-scale generationN2,N7

Export rules: Partial

Regulator
LEWA
Main utility
Lesotho Electricity Company (LEC, single buyer)
Export rulesSources conflict: net metering under 500 kW is foreseen but regulations 'not yet in place' (GET.invest); a law firm refers to net-billing rules without detail.5,6Low confidenceShow detail

Sources conflict. GET.invest (2026, sources accessed Sep 2025) says national regulation foresees a net-metering scheme under 500 kW but the regulations are "not yet in place". Afriwise (Jun 2026) refers to LEWA "distributed generation and net-billing rules" without any detail. No rule text was found

Sources: 5, 6
How exports are creditedNone foundLow confidenceShow detail

None found

Size limits and licensingLicensed renewable generators under 500 kW may connect at distribution level.5,6Medium confidenceShow detail

Licensed renewable generators under 500 kW may connect at distribution level. C&I self-generators need no generation licence. Statutory exemptions exist for some small generation (no kW figure given)

Sources: 5, 6
Mini-grid rulesMini-Grid Regulations 2021 (systems under 2 MW); under review.7High confidenceShow detail

Mini-Grid Power Generation, Distribution and Supply Regulations, 2021 (tabled 16 Feb 2021, covering systems under 2 MW). These are under review with GET.Transform

Sources: 7
Market access beyond the utilitySingle buyer (LEC); IPP PPAs negotiated bilaterally; no open access.7Medium confidenceShow detail

Single buyer (LEC). IPP PPAs are negotiated bilaterally with LEC and approved by LEWA. Only one PPA has been signed. The 2015 RE regulatory framework was never gazetted. No open access found

Sources: 7
Aggregation / VPP rulesNone foundMedium confidenceShow detail

None found

“None found” means we could not locate a rule in public sources reviewed to 10 October 2026, not that one cannot exist.

Recent developments

Dated developments, 2024–2026.

  1. 2026

    World Bank approved a US$50m credit anchored in the Mission 300 compact.7

  2. 2026

    Ember: potential generation from solar added in 2026 equals about 10% of reported 2024 generation.8

The full report

This is a snapshot. The full story is in Africa’s Invisible Grid.

The full analysis, with 17 exhibits on the boom, the data gap, the economics and the four building blocks, is in Africa’s Invisible Grid.

Get the full report

Africa’s Invisible Grid (PDF, 30 pages). Enter your details and we’ll email you a link to the report.