Country snapshot · West Africa

Liberia

Export rules: None foundData as of 10 October 2026
50.5MW
Solar added in 2026 (Ember estimate, all segments)1N1,N2
−6%
Change on 20251
2025: 53.7 MW (Ember estimate)
34.9%
Access to electricity, 20242N3
3.65million
People without electricity, 2024 (DERCA calculation)2N3

Solar added each year

Ember estimates of all solar (utility-scale, distributed and off-grid), MW. 2026 is Ember’s full-year estimate.

Liberia: solar added per year, 2023–2026, MW (Ember estimates)2023: 7.8 MW; 2024: 12.5 MW; 2025: 53.7 MW; 2026 estimate: 50.5 MW7.8202312.5202453.7202550.52026E
Liberia: solar added per year, 2023–2026, MW (Ember estimates)2023: 7.8 MW; 2024: 12.5 MW; 2025: 53.7 MW; 2026 estimate: 50.5 MW7.8202312.5202453.7202550.52026E
View as tableHide table
Solar added per year, MW
YearMWBasis
20237.8Ember estimate
202412.5Ember estimate
202553.7Ember estimate
2026E50.5Ember estimate, full year

0.3% of Africa’s estimated 2026 solar additions (50.5 of 17,449.4 MW).1

Who has electricity

Share of people with access to electricity, 2024: rural and urban.

Liberia: access to electricity, rural vs urban, 2024Rural 9.2%, urban 55.5%, national 34.9%.National 34.9%Rural 9.2%Urban 55.5%0%25%50%75%100%
Liberia: access to electricity, rural vs urban, 2024Rural 9.2%, urban 55.5%, national 34.9%.National 34.9%Rural 9.2%Urban 55.5%0%50%100%
View as tableHide table
Access to electricity, 2024
AreaAccessYear
Rural9.2%2024
Urban55.5%2024
National34.9%2024
Rural 9.2%Urban 55.5%Without electricity 3.65m (DERCA calculation)

World Bank WDI, 2024.2

How reliable is the grid for business?

Firms experiencing electrical outages (2025 survey), compared with Sub-Saharan Africa and the world.3,4N4

Liberia: share of firms experiencing electrical outagesLiberia 64.5% (2025 survey); Sub-Saharan Africa 72.4%; World 47.5% (2025).Liberia (2025)64.5%Sub-Saharan Africa72.4%World47.5%
Liberia: share of firms experiencing electrical outagesLiberia 64.5% (2025 survey); Sub-Saharan Africa 72.4%; World 47.5% (2025).Liberia (2025)64.5%Sub-SaharanAfrica72.4%World47.5%

64.5% (2025 survey) · Sub-Saharan Africa 72.4% · World 47.5% (2025)

The rules for small-scale generationN5

Export rules: None found

Regulator
LERC
Main utility
LEC; four of five distribution licensees are private
Export rulesNone found5Medium confidenceShow detail

None found

Sources: 5
How exports are creditedNone foundShow detail

None found

Size limits and licensingNot checked.Show detail

Not checked (not found in fetched sources)

Mini-grid rulesMini-grid and distribution codes exist; revisions at validation stage (Jan 2026).6Medium confidenceShow detail

LERC mini-grid and distribution codes exist; revised Mini-Grid Code + Micro-Utility Licensing Regulations at validation stage (Jan 2026), not yet gazetted

Sources: 6
Market access beyond the utilityPrivate distribution licensees operate.6Medium confidenceShow detail

Private distribution licensees (LIBENERGY, Jungle Energy Power, Energicity, Totota Electric); first utility-scale solar IPP tender targeted Aug 2025

Sources: 6
Aggregation / VPP rulesNone foundShow detail

None found

“None found” means we could not locate a rule in public sources reviewed to 10 October 2026, not that one cannot exist.

Recent developments

Dated developments, 2024–2026.

  1. Jan 2026

    Validation of mini-grid, micro-utility and multi-year tariff rules.6

  2. 2026

    Ember: potential generation from solar added in 2026 equals about 12% of reported 2024 generation.7

The full report

This is a snapshot. The full story is in Africa’s Invisible Grid.

The full analysis, with 17 exhibits on the boom, the data gap, the economics and the four building blocks, is in Africa’s Invisible Grid.

Get the full report

Africa’s Invisible Grid (PDF, 30 pages). Enter your details and we’ll email you a link to the report.