Country snapshot · Southern Africa

Mozambique

Export rules: None foundData as of 10 October 2026
453.5MW
Solar added in 2026 (Ember estimate, all segments)1N2,N3
+81%
Change on 20251
2025: 250.7 MW (Ember estimate)
36.9%
Access to electricity, 20242N4
21.85million
People without electricity, 2024 (DERCA calculation)2N4

Solar added each year

Ember estimates of all solar (utility-scale, distributed and off-grid), MW. 2026 is Ember’s full-year estimate.

Mozambique: solar added per year, 2023–2026, MW (Ember estimates)2023: 72.6 MW; 2024: 97.6 MW; 2025: 250.7 MW; 2026 estimate: 453.5 MW72.6202397.62024250.72025453.52026E
Mozambique: solar added per year, 2023–2026, MW (Ember estimates)2023: 72.6 MW; 2024: 97.6 MW; 2025: 250.7 MW; 2026 estimate: 453.5 MW72.6202397.62024250.72025453.52026E
View as tableHide table
Solar added per year, MW
YearMWBasis
202372.6Ember estimate
202497.6Ember estimate
2025250.7Ember estimate
2026E453.5Ember estimate, full year

2.6% of Africa’s estimated 2026 solar additions (453.5 of 17,449.4 MW).1

Who has electricity

Share of people with access to electricity, 2024: rural and urban.

Mozambique: access to electricity, rural vs urban, 2024Rural 12.3%, urban 79.8%, national 36.9%.National 36.9%Rural 12.3%Urban 79.8%0%25%50%75%100%
Mozambique: access to electricity, rural vs urban, 2024Rural 12.3%, urban 79.8%, national 36.9%.National 36.9%Rural 12.3%Urban 79.8%0%50%100%
View as tableHide table
Access to electricity, 2024
AreaAccessYear
Rural12.3%2024
Urban79.8%2024
National36.9%2024
Rural 12.3%Urban 79.8%Without electricity 21.85m (DERCA calculation)

World Bank WDI, 2024.2

How reliable is the grid for business?

Firms experiencing electrical outages (2025 survey), compared with Sub-Saharan Africa and the world.3,4N5

Mozambique: share of firms experiencing electrical outagesMozambique 58.8% (2025 survey); Sub-Saharan Africa 72.4%; World 47.5% (2025).Mozambique (2025)58.8%Sub-Saharan Africa72.4%World47.5%
Mozambique: share of firms experiencing electrical outagesMozambique 58.8% (2025 survey); Sub-Saharan Africa 72.4%; World 47.5% (2025).Mozambique (2025)58.8%Sub-SaharanAfrica72.4%World47.5%

58.8% (2025 survey) · Sub-Saharan Africa 72.4% · World 47.5% (2025)

The rules for small-scale generationN6

Export rules: None found

Regulator
ARENE
Main utility
EDM (single offtaker)
CrossBoundary Energy regulatory stage5N1,N7
Stage 0
Stage 0
Centralised control
Stage 1
Cautious co-existence
Stage 2
Directed benefits
Stage 3
Early market management
Export rulesNone found. Self-consumption is exempt from concession; details deferred to the Electricity Concessions Regulation (approved Mar 2026, awaiting publication).6,7Medium confidenceShow detail

None found. Electricity Law 12/2022 exempts self-consumption from concession. Self-consumption details are deferred to the Electricity Concessions Regulation, approved by the Council of Ministers in Mar 2026 and awaiting publication

Sources: 6, 7
How exports are creditedNone for small systems; grid-connected mini-grids sell to the distributor at a regulated price.6,7Medium confidenceShow detail

None found for small DER. For mini-grids connected to the national grid (REN), sale to the distributor is under contract at a regulator-approved price

Sources: 6, 7
Size limits and licensingMini-grids: up to 150 kW licence-exempt; 151 kW–1 MW; 1–10 MW.8High confidenceShow detail

Mini-grid categories: up to 150 kW (exempt from establishment and operating licences), 151 kW–1 MW, and above 1 MW to 10 MW. Self-consumption needs only a generating-centre licence

Sources: 8
Mini-grid rulesDecree 93/2021 (off-grid, mini-grids up to 10 MW); mini-grid interconnection rules (2023).9High confidenceShow detail

Decree 93/2021 (off-grid access, mini-grids ≤10 MW, in force Jan 2022). ARENE Resolução Normativa 2/ARENE-CA/2022, Regulamento de Interligação de Mini-Redes (approved 19 Dec 2022, published 16 May 2023). Mini-grid concession award rules issued May 2023

Sources: 9
Market access beyond the utilityThird-party supply allowed where the concessionaire cannot supply; no wheeling rule.9Medium confidenceShow detail

Law 12/2022 allows supply by a third party where the concessionaire cannot supply (e.g. corporate PPA). The ETS has proposed a simplified off-grid industrial PPA regime (proposal only). No wheeling rule found

Sources: 9
Aggregation / VPP rulesNone found9Low confidenceShow detail

None in force. LER 2025 notes the ETS proposal includes an "energy aggregator" role (proposal only, not seen verbatim)

Sources: 9

“None found” means we could not locate a rule in public sources reviewed to 10 October 2026, not that one cannot exist.

Recent developments

Dated developments, 2024–2026.

  1. Mar 2026

    Concessions regulation approved, awaiting publication.9

  2. Apr 2025

    First public mini-grid tender (3 MW, Nampula).9

The full report

This is a snapshot. The full story is in Africa’s Invisible Grid.