Country snapshot · Southern Africa

Namibia

Export rules: YesData as of 10 October 2026
156.2MW
Solar added in 2026 (Ember estimate, all segments)1N3,N4
+16%
Change on 20251
2025: 134.7 MW (Ember estimate)
59.3%
Access to electricity, 20242N5
1.23million
People without electricity, 2024 (DERCA calculation)2N5

Solar added each year

Ember estimates of all solar (utility-scale, distributed and off-grid), MW. 2026 is Ember’s full-year estimate.

Namibia: solar added per year, 2023–2026, MW (Ember estimates)2023: 14.1 MW; 2024: 37.8 MW; 2025: 134.7 MW; 2026 estimate: 156.2 MW14.1202337.82024134.72025156.22026E
Namibia: solar added per year, 2023–2026, MW (Ember estimates)2023: 14.1 MW; 2024: 37.8 MW; 2025: 134.7 MW; 2026 estimate: 156.2 MW14.1202337.82024134.72025156.22026E
View as tableHide table
Solar added per year, MW
YearMWBasis
202314.1Ember estimate
202437.8Ember estimate
2025134.7Ember estimate
2026E156.2Ember estimate, full year

0.9% of Africa’s estimated 2026 solar additions (156.2 of 17,449.4 MW).1

Who has electricity

Share of people with access to electricity, 2024: rural and urban.

Namibia: access to electricity, rural vs urban, 2024Rural 41.1%, urban 77.2%, national 59.3%.National 59.3%Rural 41.1%Urban 77.2%0%25%50%75%100%
Namibia: access to electricity, rural vs urban, 2024Rural 41.1%, urban 77.2%, national 59.3%.National 59.3%Rural 41.1%Urban 77.2%0%50%100%
View as tableHide table
Access to electricity, 2024
AreaAccessYear
Rural41.1%2024
Urban77.2%2024
National59.3%2024
Rural 41.1%Urban 77.2%Without electricity 1.23m (DERCA calculation)

World Bank WDI, 2024.2

How reliable is the grid for business?

Firms experiencing electrical outages (2024 survey), compared with Sub-Saharan Africa and the world.3,4N6

Namibia: share of firms experiencing electrical outagesNamibia 53.7% (2024 survey); Sub-Saharan Africa 72.4%; World 47.5% (2025).Namibia (2024)53.7%Sub-Saharan Africa72.4%World47.5%
Namibia: share of firms experiencing electrical outagesNamibia 53.7% (2024 survey); Sub-Saharan Africa 72.4%; World 47.5% (2025).Namibia (2024)53.7%Sub-SaharanAfrica72.4%World47.5%

53.7% (2024 survey) · Sub-Saharan Africa 72.4% · World 47.5% (2025)

The rules for small-scale generationN2,N7

Export rules: Yes

Regulator
Electricity Control Board (ECB)
Main utility
NamPower
CrossBoundary Energy regulatory stage5N1,N8
Stage 1 (Aug 2025 update)
Stage 0
Centralised control
Stage 1
Cautious co-existence
Stage 2
Directed benefits
Stage 3
Early market management
Export rulesNet Metering Rules (promulgated Nov 2016; exports from Jul 2017). In force.6High confidenceShow detail

Net Metering Rules (adopted 2015; promulgated Nov 2016; exports from 1 Jul 2017). In force

Sources: 6
How exports are creditedCredited at the utility's avoided energy cost, not cash; ECB publishes rates.6High confidenceShow detail

**Verified:** credited at the utility's avoided energy cost (not cash). ECB publishes the rates (e.g. "Net_Metering_Avoided_Cost_1617")

Sources: 6
Size limits and licensingUp to 500 kW (some sources say 500 kVA); feeder cap of 15% of maximum demand.7High confidenceShow detail

**Verified with a unit nuance:** pv magazine 2017 says up to 500 kVA, while IEA and the 2026 news say 500 kW. NamPower connections are first-come, first-served until 15% of the feeder's maximum demand. The 2026 ECB online platform covers ≤500 kW, including battery storage, with a 30-day approval target

Sources: 7
Mini-grid rulesNot searched.Low confidenceShow detail

None found (not specifically searched; see Gaps)

Market access beyond the utilityModified Single Buyer market since Sep 2019 (30% of energy contestable); wheeling framework since 2019.8,9High confidenceShow detail

**Verified:** the Modified Single Buyer (MSB) market opened 1 Sep 2019 with 30% of annual energy contestable. Phase 1a (Sep 2019–Jun 2021) covered transmission customers. Phase 1b (Jul 2021–Jun 2026) added distribution customers ≥1 MVA. Phase 2 (from Jul 2026) extends to distribution customers as the regulator determines and allows imports. A wheeling framework has existed since 2019

Sources: 8, 9
Aggregation / VPP rulesNone found8,9Medium confidenceShow detail

None found (CrossBoundary page does not address aggregation)

Sources: 8, 9

“None found” means we could not locate a rule in public sources reviewed to 10 October 2026, not that one cannot exist.

Recent developments

Dated developments, 2024–2026.

  1. Sep 2026

    ECB online portal for embedded generation up to 500 kW, including storage.8,9

  2. 2026

    Ember: potential generation from solar added in 2026 equals about 12% of reported 2024 generation.10

The full report

This is a snapshot. The full story is in Africa’s Invisible Grid.

The full analysis, with 17 exhibits on the boom, the data gap, the economics and the four building blocks, is in Africa’s Invisible Grid.

Get the full report

Africa’s Invisible Grid (PDF, 30 pages). Enter your details and we’ll email you a link to the report.