Rwanda
Solar added each year
Ember estimates of all solar (utility-scale, distributed and off-grid), MW. 2026 is Ember’s full-year estimate.
View as tableHide table
| Year | MW | Basis |
|---|---|---|
| 2023 | 2.0 | Ember estimate |
| 2024 | 6.6 | Ember estimate |
| 2025 | 4.8 | Ember estimate |
| 2026E | 11.6 | Ember estimate, full year |
0.1% of Africa’s estimated 2026 solar additions (11.6 of 17,449.4 MW).1
Who has electricity
Share of people with access to electricity, 2024: rural and urban.
View as tableHide table
| Area | Access | Year |
|---|---|---|
| Rural | 65.2% | 2024 |
| Urban | 88.0% | 2024 |
| National | 72.0% | 2024 |
World Bank WDI, 2024.2
How reliable is the grid for business?
Firms experiencing electrical outages (2023 survey), compared with Sub-Saharan Africa and the world.3,4N5
60.6% (2023 survey) · Sub-Saharan Africa 72.4% · World 47.5% (2025)
The rules for small-scale generationN6
Export rules: None found
- Regulator
- RURA
- Main utility
- Rwanda Energy Group (EUCL, EDCL)
Export rulesNone in force. The Prime Minister said on 30 Jul 2026 that a net-metering-type scheme is being studied.5,6High confidenceShow detail
None in force. The PM announced on 30 Jul 2026 that a net-metering-type scheme is being studied.
How exports are creditedNone found5,6Low confidenceShow detail
None found. The proposal would credit bills by exported volume, but no rates are set.
Size limits and licensingAuto-production below 50 kW needs no licence.5,6High confidenceShow detail
Auto-production <50 kW needs no licence. Generation licence fees run from US$5,000 (<0.5 MW).
Mini-grid rulesRURA mini-grid minimum technical requirements guidelines (2019).5,6Medium confidenceShow detail
Guidelines No. 02/GL/EL-EWS/RURA/2019 on Minimum Technical Requirements for mini-grids (2019)
Market access beyond the utilityREFIT Regulations (2012) allow willing-buyer, willing-seller arrangements for IPPs.5,6High confidenceShow detail
REFIT Regulations (2012), Art. 8: an IPP may use willing-buyer/willing-seller arrangements. REFIT covers hydro 50 kW–10 MW only.
Aggregation / VPP rulesNone foundShow detail
None found
“None found” means we could not locate a rule in public sources reviewed to 10 October 2026, not that one cannot exist.
Recent developments
Dated developments, 2024–2026.
- Jul 2026
Government studying household solar export (Prime Minister to Parliament).7