Country snapshot · Central Africa

São Tomé and Príncipe

Export rules: PartialData as of 10 October 2026
0.6MW
Solar added in 2026 (Ember estimate, all segments)1N3,N4
– (not shown: the 2025 base is under 10 MW)
Change on 20251N1
2025: 0.2 MW (Ember estimate)
77.7%
Access to electricity, 20242N5
0.05million
People without electricity, 2024 (DERCA calculation)2N5

Solar added each year

Ember estimates of all solar (utility-scale, distributed and off-grid), MW. 2026 is Ember’s full-year estimate.

São Tomé and Príncipe: solar added per year, 2023–2026, MW (Ember estimates)2023: 1.3 MW; 2024: 0.6 MW; 2025: 0.2 MW; 2026 estimate: 0.6 MW1.320230.620240.220250.62026E
São Tomé and Príncipe: solar added per year, 2023–2026, MW (Ember estimates)2023: 1.3 MW; 2024: 0.6 MW; 2025: 0.2 MW; 2026 estimate: 0.6 MW1.320230.620240.220250.62026E
View as tableHide table
Solar added per year, MW
YearMWBasis
20231.3Ember estimate
20240.6Ember estimate
20250.2Ember estimate
2026E0.6Ember estimate, full year

0.0% of Africa’s estimated 2026 solar additions (0.6 of 17,449.4 MW).1

Who has electricity

Share of people with access to electricity, 2024: rural and urban.

São Tomé and Príncipe: access to electricity, rural vs urban, 2024Rural 75.1%, urban 78.9%, national 77.7%.National 77.7%Rural 75.1%Urban 78.9%0%25%50%75%100%
São Tomé and Príncipe: access to electricity, rural vs urban, 2024Rural 75.1%, urban 78.9%, national 77.7%.National 77.7%Rural 75.1%Urban 78.9%0%50%100%
View as tableHide table
Access to electricity, 2024
AreaAccessYear
Rural75.1%2024
Urban78.9%2024
National77.7%2024
Rural 75.1%Urban 78.9%Without electricity 0.05m (DERCA calculation)

World Bank WDI, 2024.2

How reliable is the grid for business?

Firms experiencing electrical outages (2025 survey), compared with Sub-Saharan Africa and the world.3,4N6

São Tomé and Príncipe: share of firms experiencing electrical outagesSão Tomé and Príncipe 75.7% (2025 survey); Sub-Saharan Africa 72.4%; World 47.5% (2025).São Tomé and Príncipe(2025)75.7%Sub-Saharan Africa72.4%World47.5%
São Tomé and Príncipe: share of firms experiencing electrical outagesSão Tomé and Príncipe 75.7% (2025 survey); Sub-Saharan Africa 72.4%; World 47.5% (2025).São Tomé andPríncipe (2025)75.7%Sub-SaharanAfrica72.4%World47.5%

75.7% (2025 survey) · Sub-Saharan Africa 72.4% · World 47.5% (2025)

The rules for small-scale generationN7

Export rules: Partial

Regulator
AGER
Main utility
EMAE
Export rulesDecree-Law 26/2014 recognises self-producers delivering surplus to the grid; no net-metering or tariff mechanism found.5Medium confidenceShow detail

DL 26/2014 recognises self-producers delivering surplus to the grid and makes breach of surplus-purchase rules an offence; no net-metering/FiT tariff mechanism found. DL 1/2020 sets special transitional regime for RE IPP purchase by EMAE (single seller)

Sources: 5
How exports are creditedNone found; renewable IPPs contract PPAs freely with EMAE (DL 1/2020).5Medium confidenceShow detail

None found (DL 1/2020: parties may freely contract PPAs with EMAE)

Sources: 5
Size limits and licensingSelf-consumption below 7.5 kVA excluded; isolated systems below 150 kVA.5High confidenceShow detail

Self-consumption <7.5 kVA excluded from decree; off-grid own-use units >7.5 kVA need authorisation; isolated-locality systems <150 kVA; >30 MW reserved to Government

Sources: 5
Mini-grid rulesNo dedicated regulation; DL 26/2014 licenses isolated grids.5Medium confidenceShow detail

No dedicated mini-grid regulation; DL 26/2014 licences autonomous grids/distribution in geographically isolated localities

Sources: 5
Market access beyond the utilityIndependent and self-production licensed by government.5High confidenceShow detail

Independent production and self-production licensed by Government after regulator consultation (DL 26/2014 Art. 43(2)); DL 1/2020 RE IPP special regime with simplified licence verified by AGER

Sources: 5
Aggregation / VPP rulesNone foundShow detail

None found

“None found” means we could not locate a rule in public sources reviewed to 10 October 2026, not that one cannot exist.

Recent developmentsN2

Dated developments, 2024–2026.

No 2024–2026 development verified in the sources reviewed.

The full report

This is a snapshot. The full story is in Africa’s Invisible Grid.

The full analysis, with 17 exhibits on the boom, the data gap, the economics and the four building blocks, is in Africa’s Invisible Grid.

Get the full report

Africa’s Invisible Grid (PDF, 30 pages). Enter your details and we’ll email you a link to the report.