Country snapshot · West Africa
Sierra Leone
Solar added each year
Ember estimates of all solar (utility-scale, distributed and off-grid), MW. 2026 is Ember’s full-year estimate.
View as tableHide table
| Year | MW | Basis |
|---|---|---|
| 2023 | 36.8 | Ember estimate |
| 2024 | 34.1 | Ember estimate |
| 2025 | 71.4 | Ember estimate |
| 2026E | 156.1 | Ember estimate, full year |
0.9% of Africa’s estimated 2026 solar additions (156.1 of 17,449.4 MW).1
Who has electricity
Share of people with access to electricity, 2024: rural and urban.
View as tableHide table
| Area | Access | Year |
|---|---|---|
| Rural | 24.9% | 2024 |
| Urban | 56.4% | 2024 |
| National | 39.2% | 2024 |
World Bank WDI, 2024.2
How reliable is the grid for business?
Firms experiencing electrical outages (2023 survey), compared with Sub-Saharan Africa and the world.3,4N5
66.2% (2023 survey) · Sub-Saharan Africa 72.4% · World 47.5% (2025)
The rules for small-scale generationN6
Export rules: None found
- Regulator
- EWRC
- Main utility
- EDSA (distribution); EGTC (generation, transmission)
Export rulesNone found. Net metering proposed by stakeholders only.6Medium confidenceShow detail
None found — net metering proposed by stakeholders only
How exports are creditedNone foundShow detail
None found
Size limits and licensingCaptive generation permit rules (2019); no permit below 10 kVA.6Medium confidenceShow detail
Captive Power Generation Permit Rules 2019; no permit below 10 kVA
Mini-grid rulesSolar mini-grid regulations (2019); a 2024 revision is reported but its adoption is unconfirmed.6Medium confidenceShow detail
Solar mini-grid regulations 2019; revised 2024 (ITSF); compact lists 2019 MG regulation "update" for adoption
Market access beyond the utilityDraft Electricity Act 2024 would unbundle EDSA.6Medium confidenceShow detail
Draft Electricity Act 2024 to unbundle EDSA; IPPs may sell to grid or large private clients where EDSA absent
Aggregation / VPP rulesNone foundShow detail
None found
“None found” means we could not locate a rule in public sources reviewed to 10 October 2026, not that one cannot exist.
Recent developments
Dated developments, 2024–2026.
The full report
This is a snapshot. The full story is in Africa’s Invisible Grid.
The full analysis, with 17 exhibits on the boom, the data gap, the economics and the four building blocks, is in Africa’s Invisible Grid.