Country snapshot · Southern Africa

South Africa

Export rules: PartialData as of 10 October 2026
3,287.6MW
Solar added in 2026 (Ember estimate, all segments)1N1,N2
3,287.6 MW (3.3 GW)
+20%
Change on 20251
2025: 2,732.0 MW (Ember estimate)
90.2%
Access to electricity, 20242N3
6.27million
People without electricity, 2024 (DERCA calculation)2N3

Solar added each year

Ember estimates of all solar (utility-scale, distributed and off-grid), MW. 2026 is Ember’s full-year estimate.

South Africa: solar added per year, 2023–2026, MW (Ember estimates)2023: 3,318.0 MW; 2024: 1,690.2 MW; 2025: 2,732.0 MW; 2026 estimate: 3,287.6 MW3,318.020231,690.220242,732.020253,287.62026E
South Africa: solar added per year, 2023–2026, MW (Ember estimates)2023: 3,318.0 MW; 2024: 1,690.2 MW; 2025: 2,732.0 MW; 2026 estimate: 3,287.6 MW3,318.020231,690.220242,732.020253,287.62026E
View as tableHide table
Solar added per year, MW
YearMWBasis
20233,318.0Ember estimate
20241,690.2Ember estimate
20252,732.0Ember estimate
2026E3,287.6Ember estimate, full year

18.8% of Africa’s estimated 2026 solar additions (3,287.6 of 17,449.4 MW).1

Who has electricity

Share of people with access to electricity, 2024: rural and urban.

South Africa: access to electricity, rural vs urban, 2024Rural 86.3%, urban 92.4%, national 90.2%.National 90.2%Rural 86.3%Urban 92.4%0%25%50%75%100%
South Africa: access to electricity, rural vs urban, 2024Rural 86.3%, urban 92.4%, national 90.2%.National 90.2%Rural 86.3%Urban 92.4%0%50%100%
View as tableHide table
Access to electricity, 2024
AreaAccessYear
Rural86.3%2024
Urban92.4%2024
National90.2%2024
Rural 86.3%Urban 92.4%Without electricity 6.27m (DERCA calculation)

World Bank WDI, 2024.2

How reliable is the grid for business?

Firms experiencing electrical outages (2020 survey), compared with Sub-Saharan Africa and the world.3,4N4

South Africa: share of firms experiencing electrical outagesSouth Africa 92.0% (2020 survey); Sub-Saharan Africa 72.4%; World 47.5% (2025).South Africa (2020)92.0%Sub-Saharan Africa72.4%World47.5%
South Africa: share of firms experiencing electrical outagesSouth Africa 92.0% (2020 survey); Sub-Saharan Africa 72.4%; World 47.5% (2025).South Africa(2020)92.0%Sub-SaharanAfrica72.4%World47.5%

92.0% (2020 survey) · Sub-Saharan Africa 72.4% · World 47.5% (2025)

The rules for small-scale generationN5

Export rules: Partial5–16

Regulator
NERSA
Main utility
Eskom and municipal distributors
CrossBoundary Energy regulatory stage5N6
Stage 2 (entering)
Stage 0
Centralised control
Stage 1
Cautious co-existence
Stage 2
Directed benefits
Stage 3
Early market management
Export rulesMunicipal schemes; Eskom net-billing policy Rev 2 (Jul 2026)Show detail

Municipal schemes; Eskom net-billing policy Rev 2 (Jul 2026)

Report data register: C91,C92,D31,D47,D49,D50
How exports are creditedVaries by distributor; national export rate not setShow detail

Varies by distributor; national export rate not set

Report data register: C91,C92,D31,D47,D49,D50
Size limits and licensing<=100 kW register with distributor; larger with NERSAShow detail

<=100 kW register with distributor; larger with NERSA

Report data register: C91,C92,D31,D47,D49,D50
Mini-grid rulesNot reviewed in this edition.Show detail

Not reviewed in this edition.

Report data register: C91,C92,D31,D47,D49,D50;D31,D47,D50
Market access beyond the utilityWheeling; SAWEM delayedShow detail

Wheeling; SAWEM delayed

Report data register: C91,C92,D31,D47,D49,D50
Aggregation / VPP rulesNone (no definition)Show detail

None (no definition)

Report data register: C91,C92,D31,D47,D49,D50

“None found” means we could not locate a rule in public sources reviewed to 10 October 2026, not that one cannot exist.

Recent developments

Dated developments, 2024–2026.

  1. Jul 2026

    Eskom Wheeling and Net-billing Policy Rev 2 published.12

  2. 2026

    South African Wholesale Electricity Market launch moved from 1 Apr 2026 to Q3 2026.11

  3. mid-2026

    Rooftop solar estimated at 8.3 GW, up from 2.33 GW in Oct 2022 (Eskom transmission company).9

The full report

This is a snapshot. The full story is in Africa’s Invisible Grid.

The full analysis, with 17 exhibits on the boom, the data gap, the economics and the four building blocks, is in Africa’s Invisible Grid.

Get the full report

Africa’s Invisible Grid (PDF, 30 pages). Enter your details and we’ll email you a link to the report.