Solar added each year
Ember estimates of all solar (utility-scale, distributed and off-grid), MW. 2026 is Ember’s full-year estimate.
View as tableHide table
| Year | MW | Basis |
|---|---|---|
| 2023 | 20.9 | Ember estimate |
| 2024 | 9.0 | Ember estimate |
| 2025 | 11.9 | Ember estimate |
| 2026E | 13.8 | Ember estimate, full year |
0.1% of Africa’s estimated 2026 solar additions (13.8 of 17,449.4 MW).1
Who has electricity
Share of people with access to electricity, 2024: rural and urban.
View as tableHide table
| Area | Access | Year |
|---|---|---|
| Rural | 39.2% | 2024 |
| Urban | 85.6% | 2024 |
| National | 69.0% | 2024 |
World Bank WDI, 2024.2
How reliable is the grid for business?
Firms experiencing electrical outages (2023 survey), compared with Sub-Saharan Africa and the world.3,4N5
86.9% (2023 survey) · Sub-Saharan Africa 72.4% · World 47.5% (2025)
The rules for small-scale generationN1,N6
Export rules: Partial
- Regulator
- PURA
- Main utility
- NAWEC
Export rulesRenewable Energy Act 2013 provides net metering below 20 kW and a feed-in tariff for 20 kW–1.5 MW; the compact still commits to adopt net-metering guidelines.5–7Medium confidenceShow detail
Renewable Energy Act 2013: net metering below 20 kW; FiT 20 kW–1.5 MW. FiT/net-metering scheme "validated" June 2022. M300 compact still commits to adopt net-metering guidelines by June 2025. PURA stakeholder session on DG & net metering, Mar 2026
How exports are creditedFeed-in producers paid a fixed rate under 15-year PPAs; net-metering credit method not stated.5–7Low confidenceShow detail
FiT producers paid fixed rate (USD 0.25/kWh per Prospect 2022); FiT set in Dalasi/kWh, 15-yr PPA (NARUC). Net-metering credit method not stated
Size limits and licensingUnder 20 kW net metering; 20 kW–1.5 MW feed-in; above 1.5 MW negotiated PPA.5–7Medium confidenceShow detail
<20 kW net metering; 20 kW–1.5 MW FiT; >1.5 MW negotiated PPA
Mini-grid rulesGreen Mini Grid Regulations approved (year not stated).5–7Medium confidenceShow detail
Green Mini Grid Regulations approved (year not stated); RE Act review planned by 2026 re mini-grid tariff cap
Market access beyond the utilityTwo IPPs licensed.5–7Medium confidenceShow detail
Two IPPs licensed; distribution licences "deemed unnecessary"
Aggregation / VPP rulesNone foundShow detail
None found
“None found” means we could not locate a rule in public sources reviewed to 10 October 2026, not that one cannot exist.
Recent developments
Dated developments, 2024–2026.
- Mar 2026
PURA workshop on distributed generation and net metering with the World Bank.5–7
The full report