132.3MW
Solar added in 2026 (Ember estimate, all segments)1N2,N3
+11%
Change on 20251
2025: 119.1 MW (Ember estimate)
61.1%
Access to electricity, 20242N4
3.27million
People without electricity, 2024 (DERCA calculation)2N4

Solar added each year

Ember estimates of all solar (utility-scale, distributed and off-grid), MW. 2026 is Ember’s full-year estimate.

Togo: solar added per year, 2023–2026, MW (Ember estimates)2023: 37.4 MW; 2024: 72.9 MW; 2025: 119.1 MW; 2026 estimate: 132.3 MW37.4202372.92024119.12025132.32026E
Togo: solar added per year, 2023–2026, MW (Ember estimates)2023: 37.4 MW; 2024: 72.9 MW; 2025: 119.1 MW; 2026 estimate: 132.3 MW37.4202372.92024119.12025132.32026E
View as tableHide table
Solar added per year, MW
YearMWBasis
202337.4Ember estimate
202472.9Ember estimate
2025119.1Ember estimate
2026E132.3Ember estimate, full year

0.8% of Africa’s estimated 2026 solar additions (132.3 of 17,449.4 MW).1

Who has electricity

Share of people with access to electricity, 2024: rural and urban.

Togo: access to electricity, rural vs urban, 2024Rural 33.9%, urban 96.0%, national 61.1%.National 61.1%Rural 33.9%Urban 96.0%0%25%50%75%100%
Togo: access to electricity, rural vs urban, 2024Rural 33.9%, urban 96.0%, national 61.1%.National 61.1%Rural 33.9%Urban 96.0%0%50%100%
View as tableHide table
Access to electricity, 2024
AreaAccessYear
Rural33.9%2024
Urban96.0%2024
National61.1%2024
Rural 33.9%Urban 96.0%Without electricity 3.27m (DERCA calculation)

World Bank WDI, 2024.2

How reliable is the grid for business?

Firms experiencing electrical outages (2023 survey), compared with Sub-Saharan Africa and the world.3,4N5

Togo: share of firms experiencing electrical outagesTogo 86.1% (2023 survey); Sub-Saharan Africa 72.4%; World 47.5% (2025).Togo (2023)86.1%Sub-Saharan Africa72.4%World47.5%
Togo: share of firms experiencing electrical outagesTogo 86.1% (2023 survey); Sub-Saharan Africa 72.4%; World 47.5% (2025).Togo (2023)86.1%Sub-SaharanAfrica72.4%World47.5%

86.1% (2023 survey) · Sub-Saharan Africa 72.4% · World 47.5% (2025)

The rules for small-scale generationN1,N6

Export rules: Partial

Regulator
ARSE
Main utility
CEET
Export rulesMay 2026: ministry announced self-producers must inject surplus under a decree (not named or found). Oct 2026: reform bill adopted by Cabinet, not yet law.5–7Low confidenceShow detail

(1) **21 May 2026:** the Ministry of Energy announced that autoproducers (households and firms with solar) **must inject surplus** into the public distribution grid, "en application d'un décret fixant les conditions d'accès au réseau national". The decree is not named and was not found. (2) **6 Oct 2026:** the Council of Ministers adopted a **bill** covering autoproduction, autoconsumption, surplus RE injection and third-party access. It is not yet law. (3) AEP: an RE grid-connection code has been drafted.

Sources: 5, 6, 7
How exports are creditedNone found.5–7Medium confidenceShow detail

None found. The May 2026 announcement and the Oct 2026 bill coverage state no tariff. AEP says standard contracts and technology-specific RE tariffs are absent.

Sources: 5, 6, 7
Size limits and licensingRenewable self-consumption: free to 32 kW; declaration 32–100 kW; authorisation from 100 kW.5–7High confidenceShow detail

RE decree on power thresholds (2019; number and day illegible in scan). RE autoconsumption: free up to 32 kW; declaration above 32 kW and below 100 kW; authorisation at 100 kW and above.

Sources: 5, 6, 7
Mini-grid rulesA mini-grid and off-grid law is reported as enacted (no name or year given); mini-grid connection codes still to be developed.8Low confidenceShow detail

AEP says a mini-grid and off-grid law was enacted, with standard licences and handover rules. A LEAP/FAOLEX listing shows Loi n°2018-010 du 08/08/18 "relative à la promotion de la [production d'électricité à base des sources d'énergies renouvelables]"; the page fetch failed, so the full title is unverified. Mini-grid connection codes are still to be developed.

Sources: 8
Market access beyond the utilityOct 2026 bill would let large consumers choose a supplier (not yet law).9Low confidenceShow detail

The Oct 2026 bill would let large consumers choose their supplier, add third-party access and strengthen IPPs (not yet law). AEP says only one IPP (ContourGlobal) operates and transmission and distribution codes are not in place. A separate RE concession decree (FAOLEX Tog191848; number and date illegible) covers RE concessions for injection to the distribution grid.

Sources: 9
Aggregation / VPP rulesNone foundShow detail

None found

“None found” means we could not locate a rule in public sources reviewed to 10 October 2026, not that one cannot exist.

Recent developments

Dated developments, 2024–2026.

  1. Oct 2026

    Electricity reform bill adopted by the Council of Ministers.10

  2. 2026

    Ember: potential generation from solar added in 2026 equals about 24% of reported 2024 generation.11

  3. Sep 2025

    Mission 300 compact.10

The full report

This is a snapshot. The full story is in Africa’s Invisible Grid.

The full analysis, with 17 exhibits on the boom, the data gap, the economics and the four building blocks, is in Africa’s Invisible Grid.

Get the full report

Africa’s Invisible Grid (PDF, 30 pages). Enter your details and we’ll email you a link to the report.