Country snapshot · North Africa
Tunisia
Solar added each year
Ember estimates of all solar (utility-scale, distributed and off-grid), MW. 2026 is Ember’s full-year estimate.
View as tableHide table
| Year | MW | Basis |
|---|---|---|
| 2023 | 196.8 | Ember estimate |
| 2024 | 371.1 | Ember estimate |
| 2025 | 597.8 | Ember estimate |
| 2026E | 515.8 | Ember estimate, full year |
3.0% of Africa’s estimated 2026 solar additions (515.8 of 17,449.4 MW).1
Who has electricity
Share of people with access to electricity, 2024: rural and urban.
View as tableHide table
| Area | Access | Year |
|---|---|---|
| Rural | 100.0% | 2024 |
| Urban | 100.0% | 2024 |
| National | 100.0% | 2024 |
World Bank WDI, 2024.2
How reliable is the grid for business?
Firms experiencing electrical outages (2024 survey), compared with Sub-Saharan Africa and the world.3,4N5
35.5% (2024 survey) · Sub-Saharan Africa 72.4% · World 47.5% (2025)
The rules for small-scale generationN6
Export rules: Yes
- Regulator
- No independent regulator; Ministry of Energy with a technical commission
- Main utility
- STEG
Export rulesLaw 2015-12 self-production regime: surplus sold exclusively to STEG. Household rooftop scheme PROSOL Élec (since 2010), about 450 MW on rooftops (Apr 2026).5–7Medium confidenceShow detail
Yes. Law 2015-12 (in force) self-production regime: surplus sold exclusively to STEG within a max rate set by decree. Art. 11 covers LV-connected self-producers selling surplus under a standard contract. LV household scheme: PROSOL Élec (since 2010)
PROSOL Élec is the LV self-production scheme, with ~450 MW on rooftops (Apr 2026)
How exports are creditedSurplus sold to STEG within a capped share (30% of production for MV/HV wheeling projects). Low-voltage crediting method not confirmed.8High confidenceShow detail
Surplus is sold to STEG at a capped share. For MV/HV wheeling projects (Act 2019-47) the cap is 30% of production. The LV crediting method (net metering vs purchase) was not found on fetched pages
Size limits and licensingMV/HV self-consumption via wheeling: minimum 2 MW subscribed; ministerial authorisation.8High confidenceShow detail
Wheeling/self-consumption scheme under Act 2019-47: clients on MV/HV with min 2 MW subscribed. Ministerial authorisation required
Mini-grid rulesNone foundShow detail
None found
Market access beyond the utilitySelf-producers may wheel power over the STEG grid; standard transport and surplus contract approved Dec 2023.9High confidenceShow detail
Wheeling: self-producers have the right to transport power over the STEG grid (Law 2015-12 Art. 9; Act 2019-47). Standard transport/surplus contract approved by arrêté 8 Dec 2023 (JORT 11 Dec 2023), ending a dispute dating from 2015
Aggregation / VPP rulesNone foundShow detail
None found
“None found” means we could not locate a rule in public sources reviewed to 10 October 2026, not that one cannot exist.
Recent developments
Dated developments, 2024–2026.
The full report
This is a snapshot. The full story is in Africa’s Invisible Grid.
The full analysis, with 17 exhibits on the boom, the data gap, the economics and the four building blocks, is in Africa’s Invisible Grid.