Country snapshot · East Africa

Uganda

Export rules: PartialData as of 10 October 2026
76.0MW
Solar added in 2026 (Ember estimate, all segments)1N2,N3
+36%
Change on 20251
2025: 55.9 MW (Ember estimate)
55.3%
Access to electricity, 20242N4
22.36million
People without electricity, 2024 (DERCA calculation)2N4

Solar added each year

Ember estimates of all solar (utility-scale, distributed and off-grid), MW. 2026 is Ember’s full-year estimate.

Uganda: solar added per year, 2023–2026, MW (Ember estimates)2023: 46.0 MW; 2024: 60.3 MW; 2025: 55.9 MW; 2026 estimate: 76.0 MW46.0202360.3202455.9202576.02026E
Uganda: solar added per year, 2023–2026, MW (Ember estimates)2023: 46.0 MW; 2024: 60.3 MW; 2025: 55.9 MW; 2026 estimate: 76.0 MW46.0202360.3202455.9202576.02026E
View as tableHide table
Solar added per year, MW
YearMWBasis
202346.0Ember estimate
202460.3Ember estimate
202555.9Ember estimate
2026E76.0Ember estimate, full year

0.4% of Africa’s estimated 2026 solar additions (76.0 of 17,449.4 MW).1

Who has electricity

Share of people with access to electricity, 2024: rural and urban.

Uganda: access to electricity, rural vs urban, 2024Rural 44.8%, urban 78.3%, national 55.3%.National 55.3%Rural 44.8%Urban 78.3%0%25%50%75%100%
Uganda: access to electricity, rural vs urban, 2024Rural 44.8%, urban 78.3%, national 55.3%.National 55.3%Rural 44.8%Urban 78.3%0%50%100%
View as tableHide table
Access to electricity, 2024
AreaAccessYear
Rural44.8%2024
Urban78.3%2024
National55.3%2024
Rural 44.8%Urban 78.3%Without electricity 22.36m (DERCA calculation)

World Bank WDI, 2024.2

How reliable is the grid for business?

Firms experiencing electrical outages (2025 survey), compared with Sub-Saharan Africa and the world.3,4N5

Uganda: share of firms experiencing electrical outagesUganda 79.9% (2025 survey); Sub-Saharan Africa 72.4%; World 47.5% (2025).Uganda (2025)79.9%Sub-Saharan Africa72.4%World47.5%
Uganda: share of firms experiencing electrical outagesUganda 79.9% (2025 survey); Sub-Saharan Africa 72.4%; World 47.5% (2025).Uganda (2025)79.9%Sub-SaharanAfrica72.4%World47.5%

79.9% (2025 survey) · Sub-Saharan Africa 72.4% · World 47.5% (2025)

The rules for small-scale generationN1,N6

Export rules: Partial

Regulator
Electricity Regulatory Authority (ERA)
Main utility
UETCL (transmission); UEDCL (distribution since Apr 2025)
Export rulesSources conflict. A net-metering regulation was reported as introduced in Jul 2024 and a 3-site pilot exists; in-force status not verified. An aggregator reports draft guidelines were still at workshop stage in Aug 2025 (low confidence).5–8Low confidenceShow detail

Sources conflict. (1) GIZ PDP guide (c.2023/24) says there are no net-metering regulations, but a footnote says ERA introduced a net-metering regulation on 31 Jul 2024. (2) The Ministry of Energy page (undated, c. Aug 2023) describes a net-metering pilot at 3 sites, with regulations still to be made. (3) SurgePV (aggregator) names "Electricity (Net Metering) Regulations 2024" with draft guidelines at an Aug 2025 workshop. Another SurgePV page instead cites "Regulations 2016". In-force status is unverified.

Sources: 5, 6, 7, 8
How exports are creditedReported as bill credits with no cash payment (single secondary source; low confidence).6–8Low confidenceShow detail

SurgePV only: credits offset future bills, with no cash payment for surplus. Not confirmed in primary sources.

Sources: 6, 7, 8
Size limits and licensingGeneration licence at ≥0.5 MW; smaller projects register with ERA. Isolated grids up to 2 MW may get an exemption.6–8High confidenceShow detail

Generation licence required at ≥0.5 MW. Projects <0.5 MW are registered with ERA. Isolated grids up to 2 MW can get an exemption certificate. SurgePV gives net-metering caps of 500 kW (one page) and 1 MW (another), which conflict.

Sources: 6, 7, 8
Mini-grid rulesElectricity (Isolated Grid Systems) Regulations, 2020.9High confidenceShow detail

Electricity (Isolated Grid Systems) Regulations, 2020

Sources: 9
Market access beyond the utilityBulk supply to eligible consumers (≥1,500 kVA) for up to 30% of energy, with a wheeling agreement (2022 regulations).9High confidenceShow detail

Electricity (Supply of Electricity in Bulk to Specified Consumers) Regulations, 2022: eligible consumers need ≥1,500 kVA average demand and may buy up to 30% of their energy from an eligible seller. A wheeling and interconnection agreement is required.

Sources: 9
Aggregation / VPP rulesNone foundShow detail

None found

“None found” means we could not locate a rule in public sources reviewed to 10 October 2026, not that one cannot exist.

Recent developments

Dated developments, 2024–2026.

  1. Mar 2025

    Umeme concession ended; distribution moved to state-owned UEDCL.9

  2. Jan 2024

    REFiT Phase VI took effect (solar PV US$5.1c/kWh).9

The full report

This is a snapshot. The full story is in Africa’s Invisible Grid.

The full analysis, with 17 exhibits on the boom, the data gap, the economics and the four building blocks, is in Africa’s Invisible Grid.

Get the full report

Africa’s Invisible Grid (PDF, 30 pages). Enter your details and we’ll email you a link to the report.